OK Electrics Ltd completed the hyperscale 22 MW data centre for a blue chip american company through our partnership with Winthrop. Work began in November 2018 with the job being completed in May 2020.

We carried out the installation of all the below listed services on a fixed price labour only contract within all the colo’s and external areas:

  • Primary and secondary containment

  • General service wiring and final fix

  • Lighting wiring and final fix

  • Fire-alarm installation including wiring and final fix

- High and low level vesda and xtralis pipe sampling systems
- Addressable network fire detection system

- Pava system

- Fire dampers

 

  • Siemens busbar system

- 5000 amp main incomer
- 2500 amp ups
- 1200 amp internal feeder
- 630 amp hack supply

 

  • Complete lift and shift of all switchgear

- Main panels
- ATS
- PDU
- UPS incl. battery rack
- Isolating transformer

  • BAS system

- Pitot tube install
- Epms cabling and final fix