OK Electrics Ltd completed the hyperscale 22 MW data centre for a blue chip american company through our partnership with Winthrop. Work began in November 2018 with the job being completed in May 2020.
​
We carried out the installation of all the below listed services on a fixed price labour only contract within all the colo’s and external areas:
​
-
Primary and secondary containment
-
General service wiring and final fix
-
Lighting wiring and final fix
-
Fire-alarm installation including wiring and final fix
- High and low level vesda and xtralis pipe sampling systems
- Addressable network fire detection system
- Pava system
- Fire dampers
-
Siemens busbar system
- 5000 amp main incomer
- 2500 amp ups
- 1200 amp internal feeder
- 630 amp hack supply
-
Complete lift and shift of all switchgear
- Main panels
- ATS
- PDU
- UPS incl. battery rack
- Isolating transformer
​
-
BAS system
- Pitot tube install
- Epms cabling and final fix